Other formats

    Adobe Portable Document Format file (facsimile images)   TEI XML file   ePub eBook file  

Connect

    mail icontwitter iconBlogspot iconrss icon

Victoria University Antarctic Research Expedition Science and Logistics Reports 2002-03: VUWAE 47

Reception and planning for your event

Reception and planning for your event

This process was complicated due to the size and complexity of the program. We hired Johno Leitch as camp and program engineer and he was involved in planning and the set up of equipment from mid December for this event prior to the other event members starting on the program and arriving in Antarctica. This position required extensive knowledge of Scott Base, trade skills and field experience. In addition to an engineer salaried to the project the Scott base engineering group provided support including building core processing and sea ice mooring equipment, set up and minor modification to a Cape Roberts project drill site lab container for physical properties measurements on the core. A refuelling operation at the Willies field Road transition was co-ordinated by Scott Base Engineers. The plant operators were available to assist with the movement of the equipment and their contribution was a vital part of the operation.