Victoria University Antarctic Research Expedition Science and Logistics Reports 1984-85: VUWAE 29
August 27 - September 2
August 27 - September 2
Science personnel at Scott Base unpacked science cargo and began checking, testing and modification of equipment for the drill site science lab.
page 38All science cargo arrived on the Winfly flights with the exception of the Helium gas and regulator ordered by Antarctic Division.
Surveying equipment checked and calculations begun for drill site surveying.
Analysis of MSSTS core logs begun by Barrett for comparison with CIROS, etc.
Science personnel assisted with other preparation for CIROS at Scott Base.