Itinerary:

Itinerary:

December 3 Fitzgerald, Patterson arrive Scott Base.
December 4-5 Fitzgerald prepares field gear. Patterson survival course.
December 6 Travel Scott Base to Butter Point using Snotrac 35.
December 7-8 Work around New Harbour, east end of Kukri Hills.
December 9 Return to Scott Base.
December 10-11 Continued preparation of field gear.
December 12 Helicopter delay.
December 13 Fitzgerald, Patterson helicopter to Miers Valley. page 59 December 14-17 Work in Miers Valley area.
December 18 Helicopter move to Robertson Ridge - close support on Hjorth Hill, Mt Coleman, Mt Falconer and Mt McLennan en route. Join K043A (Korsch and George).
December 19-21 Work in the lower Victoria Valley, Robertson Ridge and Olympus Range.
December 22-23 Helicopter delay.
December 15-23 Vincent at Scott Base. Checking vehicles and field preparation for Blue Glacier.
December 24 Vincent and Hall helicopter into upper Blue Glacier from Scott Base. Fitzgerald and Patterson join them from Robertson Ridge.
December 25 Reassemble sledges, prepare crevasse rescue kits. Instigate vehicle maintenance schedule. Work on .1430 and take 30 kg rock sample for Korsch.
December 26 Work on .1890.
December 27 Wait for resupply. Practise crevasse extraction of Grizzleys and methods of travel on crevassed country.
December 28 Bad weather.
December 29 Travelled up true left of Salient Glacier. Worked on Frio Peak and ridge along south side of Salient Glacier.
December 30 Worked and sampled ends of ridges on both north and south side of Salient Glacier.
December 31 Bad weather.
January 1 Worked south end of Blue Glacier.
January 2 Move camp to Granite Knolls.
January 3 Set camp altitude from Granite Knolls trig. Sample .1243.
January 4 Fitzgerald and Vincent work Briggs Hills. Hall and Patterson wait for resupply.
January 5 Toboggan overhaul and rock packing in morning. Fitzgerald, Vincent and Patterson work on ridge beneath Chaplins Tableland. Resupply arrives 1500.
January 6 Attempt to cross Blue Glacier in order to work on Mt Kowalczyk and Williams Peak. Turned back by river running down middle of glacier.
January 7 Bad weather. Cleared up sufficiently at 1400 to work on ridge north of Lister Glacier.
January 8 Move camp to Lower Hooker Glacier in deteriorating weather.
January 9 Bad weather.
January 10 Move camp back to Granite Knolls. Work on ridge between Hooker and Salient Glaciers. Sample peak on east side of Blue. Glacier opposite Williams Peak.
January 11 Bad weather. Prepare Grizzlys, sledges and rock samples for tranport back to Scott Base.
January 12 Helicopter arrives 1415. Close support, then 2 shuttles to return to Scott Base.
January 13-14 Return field gear. Packing cargon.
January 15 Fitzgerald, Vincent assist in surveying of Mackay Glacier tongue for K042.
January 16 Fitzgerald, Vincent, Patterson return Christchurch.
Days in field - work 19
travel 9
bad weather 4
helicoter delay 4
36
Days at Scott Base 9
TOTAL 45