Fission-Track dating (K7B).

November 21 Fitzgerald joins Gleadow at Scott Base.
22 Preparation of gear.
23)
)
24) Helo delay.
25 Fitzgerald and Gleadow to Lower Wright Valley.
26)
)
27) Sampling on both sides of valley with three traverse lines completed.
28)
)
29) Helo delay.
)
30)
December 1 Close support along coast from Gneiss Pt. to Spike Cape. Fitzgerald joins K5 at Granite Harbour. Barrett (K5) and Gleadow return via Scott Base to Christchurch.
Days at Scott Base 4 (2 helo delay)
Travel 2
Helo delay in field 2
Work days 2