Victoria University Antarctic Research Expedition Science and Logistics Reports 1978-79: VUWAE 23
APPENDIX 2 - ITINERARIES
page 30
APPENDIX 2 - ITINERARIES
Event 12 - Glacial Sediment studies
Oct 17 | Robinson and Ross (DSIR field assistant) to Scott Base. |
17-20 | Preparing field gear. |
21 | Robinson and Ross to snoot of Taylor Glacier. |
22-27 | Work around glacier, on englacial debris, temperature measurements and saline discharge. |
28 | Robinson and Ross shift to Wright Upper Glacier. |
29-30 | Work around glacier; sampling englacial debris. |
31 | Walked Wright Upper Glacier to Vanda, via North Fork. |
Nov 1 | Day at Vanda. |
2 | Work on lake benches and glacial deposits, north side of Lake Vanda. |
3-4 | Robinson and Ross to Asgard Hut and Sykes and Albreich Glaciers. |
Returned Vanda Nov 4. | |
5 | Day at Vanda. |
6 | Walked to Sandy Glacier, Bull Pass. |
7 | Robinson, Ross, (and Millington and Fraser, Vanda staff) to Victoria Upper Glacier. |
7-10 | Work around glacier and lake. |
11 | Robinson and Ross to Scott Base (Millington and Fraser return to Vanda). Barrett, Bentley to Scott Base. |
12-17 | Preparation of field gear, scientific equipment, vehicles and shake-down trip to Cape Royds (13/14th). |
17 | Barrett to Mt Bastion (helo) with K13 |
18 | Robinson, Ross Bentley, Höfle, Grund travel to area of MSSTS Site 1 - 12 km NE of Butter Point with 2 Snotracs, 1 toboggan and 4 sleds. |
19-24 | Site located approximately. Lines surveyed transverse and parallel to the sea floor topography (NE and NW), each approximately 10 km long. |
25 | Barrett, and McGinnis and Power (K-10), arrive from Scott Base. |
Decision made to establish another transverse line 5 km NW. | |
26-28 | Survey of new transverse line. MSSTS Drill Site 1 selected in 131 m of water. Robinson out on 26. |
28 | Cutting access hole begins in evening. G. Lees arrives from Scott Base by helo. |
29-Dec 1 | Access hole completed by blasting. Current measurements and sampling completed. Visited and sampled icebergs near Marble Point. |
Dec 2 | Ross, Bentley, Lees toboggan to New Harbour to locate MSSTS Site 2. Barrett, Höfle arrive later with rest of equipment. |
3 | Surveying, bathymetry and location of site. |
4-5 | Access hole cut and blasted. Current measurements and contour sampling completed. Ross and Bentley survey Ferrar Glacier front. |
5-6 | Late night and early morning efforts to blast hole through 4.8 m of ice at Ferrar Glacier. |
6 | Barrett, Grund, and McGinnis and Power (K-10) to Scott Base by helo. Alan Burt and toboggan arrive. Geddes and Lees return to Scott Base in 6 hours. |
7 | Bentley, Ross carry out gravity survey of Mt Coleman. |
8 | Bentley, Höffle sample wind-blown sediments, and two icebergs in New Harbour. |
Ross, Burt carry out gravity survey up Mt Barnes. (Burt probably gets snow blindness during day). | |
9 | Ross, Bentley erect cairns for 1979/80 Drilling Camp. |
Camp shifted to Ferrar Glacier. | |
10 | Work on Ferrar Glacier access hole. Several attempts made to lower grab but no success. Improvised sampler with some success.page 31 |
Dec 11 | Burt to Scott Base by helo. (Snow blindness). |
Camp shifted to Cape Chocolate via Strand Moraines. | |
12 | Cape Chocolate, Hobbs, Blue Glacier, Strand Moraines revisited. |
13 | Back to Scott Base in early hours of morning. |
13-15 | Boss, Bentley, Höfle at Scott Base, packing and checking gear, samples, etc. |
16 | Boss, Bentley, Höfle helo to Mt Fleming to join K13. |
Event 13 - Beacon Studies
Nov 11 | Barrett, Bentley, Christoffel, Garden, Mroczek, Pyne to Scott. Flight postponed 24 hrs). |
12 | Preparing field gear (Events 12, 13). |
13 | At 1800 hrs NZST: K12, K13 to Royds by vehicle. Field gear test, survival course, gravity meter tests and paleomag sampling. |
14 | Return to Scott Base. |
15-16 | Field resupply checked and arranged for transport. |
17 | Barrett, Christoffel, Garden, Mroczek and Pyne put in Mt Bastion. (Marginal conditions - high winds). |
18-24 | Work at Mt Bastion. |
21 | Resupply cancelled - weather. |
22 | Resupply cancelled - weather. |
23 | Thanksgiving Day, no helo flights. |
24 | Second resupply attempt of the day successful; Barrett to Scott Base. |
25-Dec 2 | Continued mapping, paleomag and metamorphism sampling. |
Dec 3 | White out - Tent day. |
4 | Final sampling at Mt Bastion summit. |
5 | 1845 hrs - deteriorating weather, Richards to Bastion. |
a) Christoffel, Garden and Richards to West Beacon (see EVENT 13A). | |
b) Mroczek and Pyne to Vanda. (Move to Mt Fleming postponed). | |
6 | Mroczek and Pyne to Mt Fleming. |
7-15 | Initial reconnaissance; mapping and Weller studies begun. |
16 | Bentley, Höfle and Ross to Fleming. |
17-19 | Continued work, Höfle began work on Metschel Tillite. |
20-24 | Bentley, Mroczek and Pyne continued work at Fleming. |
20 | Höfle and Ross to Labyrinth on foot, Ross continued to Vanda Station. |
Höfle worked in Labyrinth. | |
22 | Ross to Labyrinth by helo. |
23 | Höfle and Ross to Mt Fleming. Tent Day. |
25 | Christmas Day dinner. |
26 | Storm, tent day. |
27 | Helo resupply (opportunity basis) didn't arrive. |
28-30 | Continued work. |
29 | Recce to Shapeless Mt. |
30 | 2045 hr. Bentley, Höfle, Mroczek, Ross, Pyne to Vanda via Vortex col and North Fork Labyrinth. |
31-Jan 2 | New Year at Vanda. |
Jan 2 | Ross to Don Juan Pond by foot. |
3 | Bentley, Höfle, Mroczek, Pyne to Mt Fleming (helo). |
Ross assisted Event 15 at Don Juan. | |
4-8 | Continued work. |
5 | 2045 hr Ross to Mt Fleming from Don Juan (foot). |
7 | Ross to Vanda. (foot). |
9 | Bentley, Höfle, Mroczek, Pyne to Horseshoe Mt (foot). |
Recce and mapping. | |
10-11 | Completion of mapping and Weller description.page 32 |
Jan 12 | Helo delay (weather), tent day. |
13 | Helo delay (insufficient pilots), teat day. |
14 | Bentley, Höfle, Mroczek, Pyne to Scott (helo). |
15-17 | Packing cargons, Mouse at Scott. |
18 | Bentley, Mroczek, Pyne to New Zealand. |
Days in Antarctica | 69 |
Days at Scott | 6 |
Days in field | 63 |
Travel | 8 |
Tent days, helo waits | 10 |
Work | 45 |
Event 13 - Paleomagnetic Studies
Nov 11-Dec 4 | (see Beacon Studies above) |
Dec 5 | Helo arrives with re-supply. Christoffel and Garden to W. Beacon. |
Joined by Richards. Now designated Event K13 - Bravo Hotel. | |
6 | Reconnaissance W. Beacon section and to summit for altimeter check. |
7-13 | Sampling on W. and N. faces fo w. Beacon, from New Mountain sandstone outer base to Weller coal measures near summit. |
13 | Final sampling. Garden twists knee. |
13-14 | Sorting samples, packing gear, circumnavigate Beacon for reconnaissance. |
15 | Joined by Williams. Christoffel, Richards and Williams to Table Mt. |
Garden to McMurdo for observation on leg. | |
15 | Reconnaissance of New Mountain sandstone and Terra Cotta siltstone on Table Mt. |
16 | Overhaul coring drill. Continue reconnaissance. |
17 | Sampled entire section to within 10 m of Kukri peneplain. |
18 | Return to Scott Base. |
18-20 | Packing field gear. |
20-21 | Christoffel and Garden to Christchurch (via Dunedin). |
Days in Antarctica | 40 (Nov 11-Dec 20) |
Days at Scott Base | 7 |
Days in field | 33 |
Travel | 4 |
Tent days | 1 |
Work | 28 |
Event 5 - Erebus Crater Studies
Dec 7 | Dibble to Scott Base, with Monteath, Giggenbach (DSIR), and Tazieff France |
8-9 | Preparing field gear. |
10 | Dibble to Fang acclimitization camp, with Monteath, Thompson, Giggenbach (DSIR), Fink (L & S) and Tazieff (France). |
11-12 | Climbing practice, and magnetic survey of Fang. |
13 | Party to Erebus Observatory Hut. Install seismograph and microphone at Hut. |
14 | Shift geophone to site above Ice Cave. |
15 | Shift microphone to Crater rim. |
16 | Install magnetic induction loop around Crater rim. Connect to tape recorder in Hut.page 33 |
Dec 18 | Attempted descent into inner crater. |
19 | USARP party (Kyle, Keys, McIntosh, Cashman) arrive from Fang. |
22 | Tazieff leaves for France. |
23 | Install steel cableway across Crater (for dropping penetration viscometer spears into Lava Lake) while Monteath and Giggenbach descend into inner crater (stopped by explosion at 1811 NZST). |
24 | Add nylon draw cords to cableway. (One broke almost immediately due to chemical attack and increasing wind). |
25 | Replace faulty geophone with spare one. |
26 | Magnetic induction loop broken by gales. |
27 | My tent blows down when 2 guy ropes fail. Repaired. |
28 | Cableway found to have blown down. |
29 | Retreived geophone and mirophone. Giggenbach and Fink's tent ripped and my tent completely disappeared in a full gale. |
30 | Prepare to leave. Kyle and Cashman to Scott Base. Only 1 Helo flight possible. |
31 | Dibble and Fink to Scott Base. |
Jan 3 | Dibble to Christchurch. Monteath, Thomson, Giggenbach, and McIntosh to Scott Base. |
Days in Antarctica | 27 |
Days at Scott Base | 5 |
Days in field | 22 |
Travel | 2 |
Work | 20 |