Other formats

    TEI XML file   ePub eBook file  

Connect

    mail icontwitter iconBlogspot iconrss icon

Victoria University Antarctic Research Expedition Science and Logistics Reports 1977-78: VUWAE 22

NZARP 23 OMC

NZARP 23 OMC

Scott Base
23-31 Oct Minor repairs and familiarisation of toboggans. Repaired pull-start cord and broken drive-chain during field testing of equipment.
Taylor Glacier
4 Nov Locking nut on end of flywheel and primary clutch sheave coming loose.
10 Locking nut still coming loose. Scott Base sending out new one on next resupply
28 Left hand idle spring replaced
29 General toboggan maintenance and tuning
1 Dec Replaced shoulder for leaf spring left ski and one right hand idle spring.
5 Left hand idle spring replaced. Changed primary sheave locking nut and flange. Took slack out of drive-chain. Clean and check plug gaps.
16 Toboggan running rough, seems like fuel starving.
8 Jan Replaced fuel pump, still rough.
12 Replaced pull-start recoil spring. Still poor carburettion, but no solution.
17 Primary sheave clutch spring broken, temporary repairs.
18 Base mechanic did check of toboggan. Points, advance and retard, fuel mixture all checked. Replaced primary clutch assembly. Still not running well underload and when warmed up.
21 Both rear swinging arms and bearings replaced.