Journal of the Nelson and Marlborough Historical Societies, Volume 2, Issue 3, 1989
(b) Wooded Peak
(b) Wooded Peak
Another early extraction of limestone in the district was from a small quarry on Wooded Peak, east of Nelson. Near its top end, between Third and Fourth Houses, the Dun Mountain Railway passed through the Maitai Limestone belt. In 1863 a kiln for burning limestone was built beside the track, and a quarry to supply stone was opened just above it. The resulting burnt lime was sold page 4for ls 9d per bushel (34 litres). Sales in early 1865 had reached 4 tons per week but, in the same year, Joseph Cock expressed the opinion that this kiln was poorly sited and that, if a new one were built, a saving of 5s per ton could be achieved. At this rate, the new kiln could pay for itself in a year. These figures imply a capital cost of £50 to build a new kiln. Times were uncertain, the trade declined and, by 1870, wagons could no longer negotiate the upper part of the incline to reach the quarry and kiln. A recent inspection of the quarry suggests that not more than 200 tons of stone was extracted from it.