The New Zealand Railways Magazine, Volume 3, Issue 9 (January 1, 1929)
[section]
A far reaching improvement upon the old method of weighing locomotives at Hillside Workshops has been introduced through the ingenuity of a member of the local staff. As described in the following article, locomotives can now be weighed in two hours instead of eight, as hitherto.