Estimate No. I

Circular Wall A, 5000 lineal yards @ 33/6 £8,375 Dredging at do. do. (150ft. by 3ft.) @ 50/ £12,500 Temporary Bridges (price included in cost of filling for reclamation). Reclamation (to be derived principally from dredging, and included in its price, except top portions. See below). 4,900 lineal yards Deep water Training Wall, as in Section C @ £11 53,900 Allow for Cross Channels 400 lineal yards @ £13 5,200 8100 lineal yards Wall B on bank @ 30/ 12,150 (Backing of this to be ultimately taken from Dredging, and charged with it). Dredging (to give minimum channel of 150ft. wide by 21ft. deep at high water) 832,000 cubic yards @ ½ 48,533 79,625 61,033 Contingencies, say 7½ per cent 5,972 4,577 Total cost of Walling Plant for Dredging £85,597 65,610 45,000 110,610 Re-sale of portion of Plant 22,500 Total Dredging 88,110 Total Walling 85,597 Total cost of the Scheme £173,707

Estimate No. I.

Mr. Balfour's Position of Walls.