The New Zealand Railways Magazine, Volume 5, Issue 3 (July 1, 1930)
Construction of the New Bridge Over the Otaki River. — The illustrations shew: (left) some of the completed concrete piers, the present temporary bridge and the old bridge; (right) pile driving operations
Construction of the New Bridge Over the Otaki River.
The illustrations shew: (left) some of the completed concrete piers, the present temporary bridge and the old bridge; (right) pile driving operations.