Other formats

    TEI XML file   ePub eBook file  

Connect

    mail icontwitter iconBlogspot iconrss icon

The New Zealand Railways Magazine, Volume 5, Issue 3 (July 1, 1930)

Construction of the New Bridge Over the Otaki River. — The illustrations shew: (left) some of the completed concrete piers, the present temporary bridge and the old bridge; (right) pile driving operations

Construction of the New Bridge Over the Otaki River. The illustrations shew: (left) some of the completed concrete piers, the present temporary bridge and the old bridge; (right) pile driving operations.

Construction of the New Bridge Over the Otaki River.
The illustrations shew: (left) some of the completed concrete piers, the present temporary bridge and the old bridge; (right) pile driving operations.