Other formats

    TEI XML file   ePub eBook file  

Connect

    mail icontwitter iconBlogspot iconrss icon

The New Zealand Railways Magazine, Volume 2, Issue 5 (September 1, 1927)

From left to right-Top: The workshop and temporary siding at end of viaduct. View of Waiteti Viaduct in January, 1927. Bottom: Trucks being pulled out after the span of steel plate girders had been lifted from them by means of the gantries. The span, weighing 19 1/2 tons, hanging in mid-air before being lowered into position

From left to right-Top: The workshop and temporary siding at end of viaduct. View of Waiteti Viaduct in January, 1927. Bottom: Trucks being pulled out after the span of steel plate girders had been lifted from them by means of the gantries. The span, weighing 19 1/2 tons, hanging in mid-air before being lowered into position.

From left to right-Top: The workshop and temporary siding at end of viaduct. View of Waiteti Viaduct in January, 1927. Bottom: Trucks being pulled out after the span of steel plate girders had been lifted from them by means of the gantries. The span, weighing 19 1/2 tons, hanging in mid-air before being lowered into position.