Victoria University Antarctic Research Expedition Science and Logistics Reports 2004-05: VUWAE 49
Proposed Program
Proposed Program
In the 2004/05 season it was proposed to:
- Replace the temporary data logger with the new repaired unit.
- Check and re-level the transducer where it exits the coastal rock in the sea. This was unsuccessful in 2003/04.
- Carry out the annual calibration of the tide gauge using GPS methods from the near shore floating sea ice platform (see LINZ event K450 for details).
- Consider options for future including transducer installation, metrological measurements and real time data recovery in conjunction with the continuous GPS station at Cape Roberts co-sponsored by LINZ and the USGS.