Victoria University Antarctic Research Expedition Science and Logistics Reports 1999-2000: VUWAE 44
VUW
VUW
The principal objectives of this season's work were as follows:
1) | to complete geological mapping of the Sirius Group at Allan Hills begun during the 1998-1999 season |
2) | to study deposits of the Sirius Group for the purpose of interpreting the nature of the ice that deposited it |
3) | to select sites for drilling to be conducted during 2000-2001 season |