Immediate report of Victoria University of Wellington Antarctic Expedition 1989-90: VUWAE 34
Acknowledgements
Acknowledgements
Equipment was prepared with help from Eric Broughton (RSES, VUW), the members of the VUW mechanical workshop and Peter issacs (NX Met. Service). The S4 current meter was recalibrated (0-50 cm/s) by the Oceanographic Institute DSIR. We are grateful to the Antarctic Division and Scott Base staff who assisted us in the programme planning and in Antarctica Special thanks to our field assistant /Hagglund operators Ron Rodgers and Dave Hotop, and Mike Kernot (RNZAF - 3 Squadron) who helped with the January moving recovery. Thanks also to Rob Dunbar's S-216 group for assistance testing the vibrocorer housing and hospitality while in the field. Pat Sole (K-191) once again provided much appreciated survey assistance to our programme.