Other formats

    TEI XML file   ePub eBook file  

Connect

    mail icontwitter iconBlogspot iconrss icon

Victoria University Antarctic Research Expedition Science and Logistics Reports 1977-78: VUWAE 22

Event 12 - Taylor Glacier

Event 12 - Taylor Glacier

Oct 22 Robinson, Fowlie, Palmer, Nalder to Scott Base.
21-31 Preparing field gear, scientific and surveying equipment, working on toboggans etc. One day field test of equipment.
Nov 1 Robinson, Fowlie, Palmer, Nalder and Monteath to snout of Taylor Glacier. Laying camps by helo.
2-3 Surveying ice velocity poles.
4 Shift to camp 2. Surveying and ablation measurements of Line D.
5 To camp 3. Surveying of Line E.
6 Drilling of 20 meter hole for ice temperature measurements.
7-8 Continued temperature recordings. Surveying Line F.
Monteath returns to Scott Base (Nov 7).
Shift to Camp 4 (Solitary Rocks).
10-11 Surveying Line G.
12 Tent Day, strong SW winds and blowing snow.
13 Surveying link-up network.
14 Move to Camp 5 (Kennar Valley).
15 Placing of Line H and surveying.
16 Establish trig on Finger Mt.
17 To Camp 6 (Depot Nunatak).
18 Reconnaissance of Depot Nunatak and search for USGS trig.
19 Nalder, Palmer and Fowlie to Scott Base. Hull to Depot Nunatak.
20 Continued work at Depot Nunatak.
21 Event 13 arrives Depot Nunatak. Robinson and Hull sledge to camp 4.
22 Mapping 'Dune' Valley.
23 Tent day, strong SW wind, low cloud and blowing snow.
24 Mapping Arena Valley.
25 Shift to Beacon Valley. Met up with Event 13.
26-27 Mapping Beacon Valley.
28 Shift to camp 3. Event 13 to Pearse Valley.
29-Dec 1 Temperature measurements and moraine sampling at Knobhead and Cavendish Rocks.
2 Sledge to old 'Y' camp; temperature measurements.
3 Sledge to Beehive Mt.
4-7 Bad weather. Repair toboggan and tried to find USGS trig VA 18 (Dec. 5). Climbed Northwest Mt to replace USGS trig. (Dec. 7).
8 Sledged to camp 5 (Kennar Valley).
9-15 Joined Event 25. Studied Metschel Tillite; mapped Kennar Valley.
16 Sledged to camp 1 (snout of Taylor Glacier).
17 Set up camp on shores of Lake Bonney.
18 Helo. delay.
19 Wendon arrives from Scott Base. Event 12 shifts to Lake Bonney camp.
20-26 Work on glacier tunnel.
27 Study metasediment belt.
28 Digging permafrost trench.
29-Jan 2 Photography and description of glacier margin.
3 Wendon to Scott Base. Robinson and Hull to camp p by helo.
Then to Pearse Valley by toboggan.page 22
4-6 Mapping in Pearse Valley.
7 Sledge to camp 1. Mapping along northern margin of Taylor Glacier.
8 Complete basal ice measurements in tunnel.
9-10 Helo. delay. Ablation measurements on snout poles.
11 Nalder to Taylor Glacier (camp 1). Survey for USGS benchmark on Lake Bonney.
12 Surveying velocity poles.
13 Sledge to camp 2.
14 Tent day, 40 knot winds.
15-16 Surveying. Shift to camp 3.
17 Temperature measurements, surveying and ablation recordings.
18 Nalder to Scott Base. Robinson and Hull to Kennar Valley.
19 Work in Kennar Valley.
20 Robinson and Hull to camp 3, joined by Nalder from Scott Base. Sledged to camp 4.
21 Day sledge trip to Finger Mt. and surveying to Line H.
22 Surveying on line G.
23 Robinson, Hull and Nalder return to Scott Base.
24-27 Packing and preparations for NZ return.
28 Robinson and Hull return to Christchurch.
Days in Antarctica 98 (Oct 22 - Jan 28)
Days at Scott Base 14
Days in field 84
Travel 15
Tent days and helo. waits 7
Work 61
Toboggan repairs etc. 1