Victoria University Antarctic Research Expedition Science and Logistics Reports 1976-77: VUWAE 21

Event 12/12A Taylor Glacier

Event 12/12A Taylor Glacier

Oct 15 Robinson, Keys, Nankervis, Palmer, Wicks, Sullivan to Scott Base.
16-20 Preparing field gear, scientific and surveying equipment, working on toboggan etc. One night out to test equipment.
21 Robinson, Keys, Nankervis, Palmer, Wicks to snout of Taylor Glacier. Testing equipment.
22 Robinson, Keys place depot near Cavendish Rocks, using helo.
22-24 Work snout area. survey trig control (trigs A, B, C) and velocity ablation poles (lines A, B, C) and examine saline discharge.
25 Tent day due to strong katabatic wind.
26 Half tent day. Move camp 6 km up glacier.
27 Establish trig D (Glacier) and measure back to trig C. Place poles in line D and examine saline discharge.
28 Establish trigs E (Peninsular) and F (Cliffs). Work on glacier.
29 Establish trig G (Terrace). Start survey of trig control. Place poles in line E.
30-31 Drilling 17.5 m hole and englacial temperature measurements.
Nov 1 Toboggan maintenance, temperature measurements, survey lines D, E; work at saline depressions below trig E.
2 Complete survey of lines D, E, temperature measurements. Move camp 16 km up glacier. Relaying due to broken-down toboggan.
3 Half tent day, work on toboggans.
4 Toboggan and sledge repair and maintenance.
5 Tent day due to southerly storm.
6 Search for lost equipment. Establish trig K(Ferrar) and put in line F.
7 Establish trig H (Falklands). Trip to depot to check that it is intact.
8-9 Tent days due to strong katabatics. Got ready for drilling but too windy.
10 Stern and Frost arrive and Wicks departs. Move camp 18 km up glacier. Relaying due to broken down toboggan. Toboggan repairs.
11 Drilling 15 m hole, temperature measurements.
Days in Antarctica 27 1/2 Oct 15 - Nov 11
Days at Scott Base 5 1/2
Days in field 22
Travel 2 1/2
Tent 5
Work 12 1/2
Toboggan etc. repairs 2