Victoria University Antarctic Research Expedition Science and Logistics Reports 1967-68: VUWAE 12
FIELD WORK: (4) 11th November to 21st November:
FIELD WORK: (4) 11th November to 21st November:
Whole party of six moved from Quartzite Ranges Northwards to Leitch Massif. two men parties made side trips to both East and West Quartzite Ranges, "Neale Massif" and Leitch Massif. We were visited at the Leitch Massif by Skua Gull. Temperature at this stage very cold - 15°F - 32°F.