Other formats

    Adobe Portable Document Format file (facsimile images)   TEI XML file   ePub eBook file  

Connect

    mail icontwitter iconBlogspot iconrss icon

Salient: Victoria University Students' Paper. Vol. 28, No. 11. 1965.

Boring

Boring

Test drillings have been carried out on the site of the new biology building, which is to be built on the Kelburn Parade frontage between the Easterfield Building and the Kirk Building.

The drilling was carried out to determine the nature of the rock strata in the area. Dr. Culliford said that it was quite likely that two contracts would be let for the building—one for the foundations and another for the main building.