Other formats

    TEI XML file   ePub eBook file  

Connect

    mail icontwitter iconBlogspot iconrss icon

The New Zealand Railways Magazine, Volume 2, Issue 3 (July 1, 1927)

Interlocking Completed

Interlocking Completed.

The Department has completed the installation of power interlocking at Whangarei, Paerata, Papakura, and Stillwater stations, together with the provision of three-position colour light signals at each place. The interlocking for these installations is controlled from the station office, thus avoiding the necessity for employing a special signalling staff.