Other formats

    Adobe Portable Document Format file (facsimile images)   TEI XML file   ePub eBook file  

Connect

    mail icontwitter iconBlogspot iconrss icon

Victoria University Antarctic Research Expedition Science and Logistics Reports 2004-05: VUWAE 49

Fig. 3: A) Core barrel loading, B) record of core quality, C) control panel, D) extracting cuttings, E) core barrel extracted from drill barrel, F) discharging cuttings, G) adjustment of cutters and core catchers, H) drilling discussions, I) drilling at 165.5m depth

Fig. 3: A) Core barrel loading, B) record of core quality, C) control panel, D) extracting cuttings, E) core barrel extracted from drill barrel, F) discharging cuttings, G) adjustment of cutters and core catchers, H) drilling discussions, I) drilling at 165.5m depth.

Fig. 3: A) Core barrel loading, B) record of core quality, C) control panel, D) extracting cuttings, E) core barrel extracted from drill barrel, F) discharging cuttings, G) adjustment of cutters and core catchers, H) drilling discussions, I) drilling at 165.5m depth.