The New Zealand Railways Magazine, Volume 3, Issue 7 (November 1, 1928)

Electrification On N. Z. R. — 500 K. V. A. transformer being placed in the Sub-Station at Addington for the Lyttelton-Christchurch Electrification Scheme

Electrification On N. Z. R. 500 K. V. A. transformer being placed in the Sub-Station at Addington for the Lyttelton-Christchurch Electrification Scheme.

Electrification On N. Z. R.
500 K. V. A. transformer being placed in the Sub-Station at Addington for the Lyttelton-Christchurch Electrification Scheme.