The New Zealand Railways Magazine, Volume 2, Issue 3 (July 1, 1927)
Frankton Junction Improvements. — 1. The new signal gantry. 2. Relay box. 3. Lifting out the old signal gantry (weighing about 5 tons) by steam crane. 4. The two cranes at work
Frankton Junction Improvements.
1. The new signal gantry. 2. Relay box. 3. Lifting out the old signal gantry (weighing about 5 tons) by steam crane. 4. The two cranes at work.