The New Zealand Railways Magazine, Volume 1, Issue 5 (September 24, 1926)

Addington Workshops Re-Organisation.—New Tarpaulin Shop. — The walls, storey posts and roof trusses of the above building were erected in 3 1/2 days by a gang of seven men and a steam crane, under the direction of the Foreman of Works. The photograph was taken some days later after permanent bracings, purlins, etc. had been added. The dimensions of the new tarpaulin shop are:– Length, 172ft.; width, 75ft.; height of wall, 28ft

Addington Workshops Re-Organisation.—New Tarpaulin Shop. The walls, storey posts and roof trusses of the above building were erected in 3 1/2 days by a gang of seven men and a steam crane, under the direction of the Foreman of Works. The photograph was taken some days later after permanent bracings, purlins, etc. had been added. The dimensions of the new tarpaulin shop are:– Length, 172ft.; width, 75ft.; height of wall, 28ft.

Addington Workshops Re-Organisation.—New Tarpaulin Shop.
The walls, storey posts and roof trusses of the above building were erected in 3 1/2 days by a gang of seven men and a steam crane, under the direction of the Foreman of Works. The photograph was taken some days later after permanent bracings, purlins, etc. had been added. The dimensions of the new tarpaulin shop are:– Length, 172ft.; width, 75ft.; height of wall, 28ft.